Grabrails MRWA
"Our selection is not based on price alone; we also took into consideration the saving aspects.
ZERO WASTE Foundations allow quick replacement of items with no further effort required to the base and reduce the risk of injury to employees by reducing time spent exposed to traffic” MRWA
FAST EFFICIENT INSTALLATION Ground sockets (or grab -ails) can be installed when pouring concrete or asphalt (even paved areas) and the grab-rails for an entire development can be installed in a single day, saving thousands on large jobs
PRISTINE FINISH Resulting in a superior finish with all grab-rails perfectly aligned, safe and secure - remaining in pristine condition for the life of a development (100 years) ZERO damage or waste |
![]() |
ERGONOMIC TOOLS A tool is provided to enable installation of sockets from a standing position. A leverage tool is hooked around the leg of the grab rail (one at a time) and a jerking action applied to release the lock and remove the item from the ground socket. All work is conducted quickly and efficiently from a standing position - tools work every time (we even have a tool for sheared off posts and flattened grab rails are simply levered up) The only cost for installing & maintaining infrastructure, is labour NB: MRWA maintenance teams have tools |
![]() |
View MRWA Grab-rail specification drawing below.
MRWA GRAB-RAILS AVAILABLE IN FOLLOWING SIZES:
- 600
- 900
- 1200
- 1500
- 1800